Project Summary

Delivered a trial at Bristol Temple Meads Station that focused on using a LIDAR crowd monitoring system called Situate which uses Artificial Intelligence to alert operators to incidents in real time and warn of concerning activity. A single sensor can cover large distances and be alert to people running or standing too close to the platform edge.

Project Achievements

Createc successfully installed two LIDAR sensors on platform 11 at Bristol Temple Meads and developed their Situate solution to detect unsafe passenger behaviours in real time. The team created two new algorithms that can identify running and line crossing, providing Network Rail with LIDAR data in second intervals. A significant innovation was the development and testing of a prototype audio alerting system that directly alerts passengers to unsafe behaviour through speakers. Testing demonstrated 79% accuracy for detecting yellow line crossing and 65% accuracy for running detection, with a 4-second latency for alerts. The solution tracked platform trends over three months, identifying patterns such as repeated staircase blocking during busy periods. Createc successfully navigated the complex installation process including possessions and electricity connectivity. Through nine staff interviews, they identified critical insights about operational challenges and confirmed strong market fit for their technology.

Conclusions

The trial validated Createc’s Situate technology as an effective solution for anonymous crowd monitoring that addresses real operational challenges at train stations. Critical insights emerged showing that station staff lack capacity to constantly monitor platforms and face unpredictable high-risk passenger behaviours daily, while struggling with crowding at peak times due to platform design limitations. The trial proved that staff cannot continuously watch screens for alerts, fundamentally shaping Createc’s value proposition and future business approach. The technology demonstrated its ability to provide continuous monitoring when staff cannot, improving live situational awareness of passenger numbers, density levels, and unsafe behaviours. The solution’s capacity to track platform trends and provide accurate data offers valuable evidence for station managers addressing dwell time and overcrowding challenges. The successful integration of real-time detection with direct passenger alerting represents a significant technological advancement in platform safety management.

Next Steps

Network Rail has committed to a one-year trial of Situate on Waterloo Station’s concourse to address crowding challenges, demonstrating confidence in the technology’s effectiveness. Createc have also secured a trial with King’s Cross Station. Createc will focus on improving the accuracy rates for detecting and alerting unsafe behaviours around running and line crossing to achieve a minimum 80% accuracy threshold. Development will continue to enable full curb-to-train coverage of the passenger journey, expanding the solution’s scope beyond platform-only monitoring. Additional opportunities identified for Createc’s value proposition include detecting people on tracks, enhancing safety at level crossings, and supporting unmanned stations. The company is actively working to identify new methods for delivering critical information to station staff, moving beyond screen-based alerts to more practical real-time notification systems that accommodate the operational realities of station environments where staff cannot constantly monitor displays.

Other Projects